Handover is where many projects lose the trust they earned on site. A good checklist is not a pile of certificates. It is a walk-through that the client can follow.

Our minimum

  • Snag list closed, with photographs
  • Keys, access and warranties labelled
  • Services demonstrated: AC, irrigation, lighting scenes, water
  • As-built drawings and operation notes in one pack
  • A named person for the first months of care

We stay available after you move in. That is the last of our four steps: handover and care.